Fairway maintenance

Fairway maintenance vessel ORV 1

Fairway maintenance vessel ORV 1

ORV1 fairway vessel is also capable of operating in a flat ice field with a maximum thickness of 10 cm.

The vessel is equipped with a Hiab SeaCrane crane with a lifting capacity of 7.5 tons. The winch capacity is 2.0 tons.

The vessel is equipped also with oil spill response equipment.

The vessel's oil collection capacity:

  • Collection speed max. 3 knots

  • Sweeping width 2 x 6 m
  • Tank space 2 bagging devices á 600 l
  • Collection capacity 2 x 80 m³/h
Fairway maintenance vessel ORV 1

Specifications

Built 2012
Length 17.7 m
Breadth 4.95 m
Operational draught 1.3 m
Speed 20 knots
GT 42 t
NT 13 t
Engine Equipment 2 x Scania 373 kW
Deck crane Hiab SeaCrane 7,5 tn
Winch 2.0 t

Fairway maintenance

Read more about our fleet

Hydrographic surveys

Read more about our fleet

Icebreakers

Read more about our fleet

Get to know us better